Back to overview

Cabinari trade supply

Cabinet sizing

Use these guides to turn a site survey into dimensions a cabinet supplier can quote. Start with the finished room, locate openings and services, then identify the unit that controls fabrication. Compare the cabinet schedule with the elevations and keep allowances for fillers and installation separate from measured widths. If an appliance or wall finish is undecided, record which dimensions depend on it. The drawing checklist helps you hand off the survey and flag anything that needs a final site check.

Read in this order

  1. How to measure for kitchen cabinets
  2. Cabinet drawing checklist

Key concepts

Finished opening
Measure between the surfaces that will remain after installation.
Reference point
Use one marked corner for horizontal offsets.
Controlling unit
Identify the unit used for fabrication.
Clear opening
Record the space available for the intended component.
Filler allowance
Show the width reserved for fitting the run.

Apply this topic to your project

Begin with a survey of the finished room. Give each wall a reference name and record which end was used as the starting point. Measure where the cabinet run will actually sit, including the points where tall units meet a ceiling or bulkhead. If the room narrows at one height, show that on the elevation so the designer can review the fit. For a renovation, mark items that will be removed and identify the surfaces that will remain. Where new wall finishes are planned, show the expected finished dimension and record who will confirm it before production.

Next, place the openings and services on the same plan. Include the position and width of each door and window, and show the swing where it can affect a cabinet front. Record the height and offset of water, waste and electrical connections. Attach the drawings for selected appliances and check their required openings and service clearances. Keep the appliance model references next to the dimensions so another reviewer can verify them. If a model has yet to be selected, mark the affected cabinet width or opening as provisional.

Turn the survey into a cabinet schedule. Use the same identifiers on the floor plan, elevations and quantity list. Distinguish outside cabinet dimensions from clear openings and the size of a separately supplied panel. Show fillers independently and identify where installers are expected to trim them on site. Review cabinet runs against the narrowest usable width and check the opening movement of adjacent doors, drawers and appliances. If two layouts are mirrored, show the handing explicitly before combining the quantities.

Before requesting a final quote, check that the survey, elevations and schedule use one controlling unit and the same drawing revision. Keep the original measurements available for review if values were converted. Ask the installer to confirm site clearances and the supplier to identify assumptions about cabinets, fillers and finished ends. Record the decision for any dimension that was provisional. Share the approved schedule with purchasing and installation so both teams can compare the delivered items with the same reference.

Related cabinet products

Request a cabinet quote

WhatsApp
EnquireWhatsAppEmail