Back to overview

Cabinari trade supply

Kitchen wall cabinets

Wall cabinets coordinated with mounting heights and door clearances.

Measure from the finished worktop and wall

Show the finished worktop, cabinet underside and ceiling on one elevation. Give each a height from the same reference point so the installer can check the space between them. Where the ceiling slopes or the wall steps back, record those changes at the cabinet positions they affect. Indicate whether the cabinet dimensions include a top trim, light rail or finished end, and identify which pieces will be fitted separately.

Confirm the appliance model before approving cabinets around a hood or microwave. Share the appliance installation drawing with the cabinet supplier and installer. Ask them to confirm the clearances and service access for the actual equipment. Where the appliance sits between two cabinets, mark the opening separately from the width of the run and show which fillers will be cut to fit on site.

Coordinate fixing and underside details

Ask the installer to identify the wall construction and the fixing locations they can use. Put that information on the drawing so the cabinet supplier can show the proposed fixing provisions. Confirm the fixing method with the installer for the actual wall and cabinet configuration. If the underside is visible, mark the required finish, lighting channel and cable exit. Agree which contractor supplies lighting components and which prepares the openings.

Check first assembly and delivery

Review a representative unit with the doors and shelves fitted. Open the door next to an adjacent cabinet or appliance outline and check the handle and hinge clearances. Look at the underside from the expected viewing position to confirm the finished edges and light rail meet as drawn. Keep photographs with the drawing revision and mark any adjustments before releasing the remaining units.

On delivery, match cabinet and trim references against the packing list before distributing cartons. Keep left and right finished ends separate. If a part is missing or damaged, record the carton label, cabinet reference and the edge that will be visible after installation. Keep the fixing hardware with its designated cabinet.

Check cabinet dimensions on the schedule

These widths are planning references for the kitchen cabinet range. Confirm availability, depth and height for the series and cabinet type on your quote.

Reference cabinet widths in inches and millimetres
Width (in)Width (mm)
9229
12305
15381
18457
21533
24610
27686
30762
33838
36914
39991
421,067
451,143
481,219

Specify the finished depth and height in both units when suppliers use different drawing conventions. Mark the appliance or accessory opening separately and identify whether the overall dimensions include fronts, feet and finished panels.

Request a packing schedule for this series

Ask for a line per cabinet reference and packing configuration. For example, if a cabinet box and its door kit travel separately, request the carton count, outside dimensions and gross weight for each package. Confirm how the cartons are labeled so receiving staff can match them to the same cabinet.

To compare 40 ft high-cube loading plans, give your freight planner the actual package mix, dimensions, gross weights and stacking limits. Use the loading estimator for identical cartons and verify the mixed-load plan before booking.

Prepare a series-specific quote request

  1. Identify the series and specify the cabinet construction and door profile.
  2. Send dimensioned elevations and a cabinet schedule with quantities, finished sizes and clear openings.
  3. Mark exposed faces and ends, the finish reference and any sample you need to approve.
  4. List required hinges, runners and accessories with their mounting clearances.
  5. Specify assembled or flat-pack delivery, destination and target arrival date.

Use the drawing checklist to reconcile the elevation and schedule, then submit your cabinet quote request.

Compare the Kitchen cabinets category, review the quote checklist and confirm packing and handling requirements for this series.

Frequently asked questions

What dimensions should I include for this series?
List the finished width, depth and height for each cabinet. Give the clear opening separately when a fitting or appliance must pass through it.
Can I change the construction or door profile?
Show the requested change on the elevation and identify any affected clearances. Ask the supplier to confirm the available combination on the quote.
How do I approve the finish?
Request a physical sample with the specified face and edge treatment and identify adjoining parts that must match.
What should I check before selecting hardware?
Confirm door swing, runner length, mounting clearances and access to adjacent cabinets on the shop drawings.
How can I compare packing options?
Ask for carton quantities, packed dimensions and gross weights for the proposed assembled or flat-pack order.

What to specify

Our quotation uses elevations showing the ceiling, bulkheads and appliances below the run. Installation requirements depend on the wall construction and installer-approved mounting details.

Related topics

Request a cabinet quote

WhatsApp
EnquireWhatsAppEmail