Cabinari trade supply
Inset kitchen cabinet planning
Inset cabinet layouts developed around face-frame openings.
Dimension each opening and front together
Give each cabinet and front an identifier on the elevation. Dimension the clear width and height between the finished frame members. Mark the intended reveal at the top, bottom and both sides of each front. For a paired opening, show where the two doors meet and whether a center stile divides the opening. Include the neighboring drawer front in the same elevation so the approval team can compare the horizontal lines across the run.
Ask the supplier to show a section through the frame, front and mounting hardware. The drawing should show where the front sits when closed and how far the hinge projects into the opening when open. Check the installation against the access needed for any pull-out trays and removable shelves. If an end cabinet is beside a wall, show the wall and finished trim on the drawing and confirm that the selected handle can clear them.
Check fit after the boxes are installed
Ask the installer to measure the opening diagonally in both directions once the cabinet has been set and fastened. Record the width at the top and bottom, then compare those readings with the approved dimensions. If the reveals differ from the sample, check the box alignment and mounting points before adjusting the front. Log the cabinet reference and the observed gap so the supplier can review the right assembly.
Inspect the sample in the intended configuration
Review the sample with its actual door, drawer front, frame, hinges and finish assembled. Measure the reveal at several points and record which edges are checked. Open the door and adjacent drawer separately, then together, to check for contact. If adjustments are necessary, record the settings and ask how installers will reproduce the approved position after delivery. Confirm the agreed tolerance and inspection method on the drawing before authorizing the remaining cabinets.
For repeated layouts, keep a record of which openings are handed left or right and identify any front that shares a hinge pattern with a different cabinet. Match the front and hinge identifiers to the packing list. If a replacement is needed later, send the original opening reference, measured dimensions and finish sample reference so the supplier can check fit and appearance against the approved assembly.
Check cabinet dimensions on the schedule
These widths are planning references for the kitchen cabinet range. Confirm availability, depth and height for the series and cabinet type on your quote.
| Width (in) | Width (mm) |
|---|---|
| 9 | 229 |
| 12 | 305 |
| 15 | 381 |
| 18 | 457 |
| 21 | 533 |
| 24 | 610 |
| 27 | 686 |
| 30 | 762 |
| 33 | 838 |
| 36 | 914 |
| 39 | 991 |
| 42 | 1,067 |
| 45 | 1,143 |
| 48 | 1,219 |
Specify the finished depth and height in both units when suppliers use different drawing conventions. Mark the appliance or accessory opening separately and identify whether the overall dimensions include fronts, feet and finished panels.
Request a packing schedule for this series
Ask for a line per cabinet reference and packing configuration. For example, if a cabinet box and its door kit travel separately, request the carton count, outside dimensions and gross weight for each package. Confirm how the cartons are labeled so receiving staff can match them to the same cabinet.
To compare 40 ft high-cube loading plans, give your freight planner the actual package mix, dimensions, gross weights and stacking limits. Use the loading estimator for identical cartons and verify the mixed-load plan before booking.
Prepare a series-specific quote request
- Identify the series and specify the cabinet construction and door profile.
- Send dimensioned elevations and a cabinet schedule with quantities, finished sizes and clear openings.
- Mark exposed faces and ends, the finish reference and any sample you need to approve.
- List required hinges, runners and accessories with their mounting clearances.
- Specify assembled or flat-pack delivery, destination and target arrival date.
Use the drawing checklist to reconcile the elevation and schedule, then submit your cabinet quote request.
Compare the Kitchen cabinets category, review the quote checklist and confirm packing and handling requirements for this series.
Frequently asked questions
- What reveal should I specify?
- Dimension the desired gap on each edge and ask the supplier to confirm the achievable tolerance on an assembled sample.
- What if a pull-out passes behind an inset door?
- Check its travel against the clear opening with the specified hinge and door fully open.
- What dimensions should I include for this series?
- List the finished width, depth and height for each cabinet. Give the clear opening separately when a fitting or appliance must pass through it.
- Can I change the construction or door profile?
- Show the requested change on the elevation and identify any affected clearances. Ask the supplier to confirm the available combination on the quote.
- How do I approve the finish?
- Request a physical sample with the specified face and edge treatment and identify adjoining parts that must match.
- What should I check before selecting hardware?
- Confirm door swing, runner length, mounting clearances and access to adjacent cabinets on the shop drawings.
- How can I compare packing options?
- Ask for carton quantities, packed dimensions and gross weights for the proposed assembled or flat-pack order.
What to specify
Our quotation uses front elevations and sections showing opening dimensions, front thickness, reveals, hinges and swing clearance. Availability and an assembled sample are established before production.