Back to overview

Cabinari trade supply

Walk-in wardrobes

Plan hanging storage, drawers and shelving for a walk-in wardrobe.

Lay out the aisle before choosing storage modules

Draw the finished walls, doorway, window and any ceiling changes on a plan. Mark the depth of each storage run and show how much space remains between opposing units. Check that the entrance door clears the first module. Where the layout includes an island, draw its handles and open drawers to see how it affects access to the surrounding cabinets. Measure the finished room again before approving a run that fits between walls.

For a narrow aisle, identify the drawers or doors likely to be used at the same time. Check whether an open drawer blocks the route to another storage bay. If access is tight, compare a shallower module, a different drawer position or open shelving. Record the chosen arrangement on the elevation so the quote reflects the actual module depths and front types.

Plan hanging, shelving and drawers by bay

List what each bay needs to hold. Separate long garments from shorter hanging items and show where shelves must remain adjustable. Put rails, shelf supports and drawers on the elevation and identify the hardware required for each. For a corner, check which rail or shelf can be reached once the adjoining run is installed. Keep frequently used items in bays that are accessible from the entrance and mark any items needing dedicated space.

Review the shelf and hanging positions with the buyer before approving drawings. If the layout includes lighting, show the cable route and access to the power supply. Agree which trade supplies the lighting and which prepares the openings. Identify any service panels or outlets that must remain accessible after the cabinet is fitted.

Approve a representative bay before production

Choose a bay that includes both an internal fitting and a finished front. Check shelf fit, rail position, drawer travel and the gap beside the neighboring module. Review the finish under the intended room lighting, including visible edges and the underside of shelves. Record the approved sample, hardware references and drawing revision. If a module needs a different finish or fitting, list it separately before releasing the order.

Group the cartons in installation order

Label the modules by room and wall. Match the labels to the installation sequence, especially where corner units need to go in before the adjacent run. Keep rail brackets, shelf pins and other small fittings with the relevant module. At handover, record any site changes and retain the finish sample and hardware references. A future replacement can then be checked against the installed layout and the actual room record.

For a shared dressing room, mark which bays belong to each user and which fittings are shared. Check the labels against that plan before fixing rails or drawers, particularly where mirrored modules use similar panels. Label shared fittings separately on the packing list.

Request a packing schedule for this series

Ask for a line per cabinet reference and packing configuration. For example, if a cabinet box and its door kit travel separately, request the carton count, outside dimensions and gross weight for each package. Confirm how the cartons are labeled so receiving staff can match them to the same cabinet.

To compare 40 ft high-cube loading plans, give your freight planner the actual package mix, dimensions, gross weights and stacking limits. Use the loading estimator for identical cartons and verify the mixed-load plan before booking.

Prepare a series-specific quote request

  1. Identify the series and specify the cabinet construction and door profile.
  2. Send dimensioned elevations and a cabinet schedule with quantities, finished sizes and clear openings.
  3. Mark exposed faces and ends, the finish reference and any sample you need to approve.
  4. List required hinges, runners and accessories with their mounting clearances.
  5. Specify assembled or flat-pack delivery, destination and target arrival date.

Use the drawing checklist to reconcile the elevation and schedule, then submit your cabinet quote request.

Compare the Wardrobes and closets category, review the quote checklist and confirm packing and handling requirements for this series.

Frequently asked questions

What dimensions should I include for this series?
List the finished width, depth and height for each cabinet. Give the clear opening separately when a fitting or appliance must pass through it.
Can I change the construction or door profile?
Show the requested change on the elevation and identify any affected clearances. Ask the supplier to confirm the available combination on the quote.
How do I approve the finish?
Request a physical sample with the specified face and edge treatment and identify adjoining parts that must match.
What should I check before selecting hardware?
Confirm door swing, runner length, mounting clearances and access to adjacent cabinets on the shop drawings.
How can I compare packing options?
Ask for carton quantities, packed dimensions and gross weights for the proposed assembled or flat-pack order.

What to specify

Send the room plan with the entry, corners and any service access. Separate long-hang, double-hang, shelves and drawers on the cabinet schedule. Mark the clear aisle and the movement of drawers and hinged doors.

Layout examples

Walk-in wardrobe with open shelving and hanging storage
Walk-in wardrobe with open shelving and hanging storage

Related topics

Request a cabinet quote

WhatsApp
EnquireWhatsAppEmail