Cabinari trade supply
Sliding-door wardrobes
Sliding wardrobe layouts with coordinated tracks and interior access.
Coordinate the track and finished opening
Measure the opening at several points after wall and floor finishes are installed. Show the top and bottom mounting surfaces in section and ask the hardware supplier which dimensions govern the track length and door height. Mark any skirting or trim that could interfere with the panel travel. Agree which parts will be cut on site and which should arrive at the finished dimensions.
Check access at each door position
Show where each panel stops and which wardrobe bays are exposed in that position. Open each internal drawer on the drawing and check that it clears the edge of the sliding panel and its handle. For overlapping panels, confirm the intended overlap and identify which panel travels in front. Keep these details with the elevations so the installer can verify them during the first assembly.
Review the panel and hardware as one assembly
Give the supplier the panel dimensions, finish, handle position and proposed hardware reference. Ask which limits apply to the quoted configuration and compare those limits with the finished panel and its fittings. For a mirrored or otherwise heavy panel, confirm the actual packed weight and handling method with the installer. Give each panel a reference on the elevation so its hardware can be matched at receiving.
For repeated rooms, use the smallest finished opening and the room with the deepest trim to review the first layout. Check that both panels can reach their end positions and that the handles remain accessible. Verify that an internal drawer can be opened and removed at the panel position shown on the drawing. Record any change to the track length, panel overlap or stop location before releasing the remaining rooms.
Keep each hardware set with its door group
At receiving, compare panel labels, track lengths and the hardware list before sending cartons to individual rooms. Keep the guides and stops with their assigned tracks. If a panel rubs or stops early during trial fitting, record the room, door reference and position where it happens. Ask the installer to compare the actual opening and track position with the approved drawing before modifying a part.
At handover, give the maintenance team the installed track and roller references, the panel finish and the room schedule. Retain the supplier instructions for removing and refitting each panel, and note where the matching spares are stored.
If the same finish is used in several rooms, record the panel dimensions and hardware reference separately. Match both details before transferring a spare panel to another room.
Inspect the first assembled door set
Check the track, rollers, stops and guides against the approved hardware list. Slide each panel through its intended range and confirm that the fronts align at the closed position. Record which carton contains each hardware set and identify left and right parts. Keep the approved drawing and hardware references for maintenance and replacements.
Request a packing schedule for this series
Ask for a line per cabinet reference and packing configuration. For example, if a cabinet box and its door kit travel separately, request the carton count, outside dimensions and gross weight for each package. Confirm how the cartons are labeled so receiving staff can match them to the same cabinet.
To compare 40 ft high-cube loading plans, give your freight planner the actual package mix, dimensions, gross weights and stacking limits. Use the loading estimator for identical cartons and verify the mixed-load plan before booking.
Prepare a series-specific quote request
- Identify the series and specify the cabinet construction and door profile.
- Send dimensioned elevations and a cabinet schedule with quantities, finished sizes and clear openings.
- Mark exposed faces and ends, the finish reference and any sample you need to approve.
- List required hinges, runners and accessories with their mounting clearances.
- Specify assembled or flat-pack delivery, destination and target arrival date.
Use the drawing checklist to reconcile the elevation and schedule, then submit your cabinet quote request.
Compare the Wardrobes and closets category, review the quote checklist and confirm packing and handling requirements for this series.
Frequently asked questions
- What dimensions should I include for this series?
- List the finished width, depth and height for each cabinet. Give the clear opening separately when a fitting or appliance must pass through it.
- Can I change the construction or door profile?
- Show the requested change on the elevation and identify any affected clearances. Ask the supplier to confirm the available combination on the quote.
- How do I approve the finish?
- Request a physical sample with the specified face and edge treatment and identify adjoining parts that must match.
- What should I check before selecting hardware?
- Confirm door swing, runner length, mounting clearances and access to adjacent cabinets on the shop drawings.
- How can I compare packing options?
- Ask for carton quantities, packed dimensions and gross weights for the proposed assembled or flat-pack order.
What to specify
Our quotation covers opening and panel dimensions, track positions and accessible interior space. Drawer and handle clearances are documented against the sliding door path.