Cabinari trade supply
Slab cabinet doors
Slab cabinet fronts with coordinated face and edge finishes.
Check compatibility with the existing cabinet
Specify the face and each exposed edge
Identify the proposed substrate, front finish, reverse finish and edge treatment in the door schedule. Give the finished thickness as a separate dimension and ask how the selected surface and edges affect it. For an exposed end beside the last door, request both pieces as a sample. Inspect the line where the door edge meets the end panel with the door closed and again while opening it.
If the surface has a directional grain or pattern, draw an arrow on each front and number the pieces that should be matched. Include drawer fronts, fillers and end panels when they are part of the same visual group. Ask the supplier to show how those references will appear on cartons. Where an appliance interrupts the run, decide whether matching continues across the opening and mark the decision on the elevation.
Set the drilling reference for each front
Send a separate drilling view showing which face is viewed and which edge serves as the reference. Include hinge cup positions, attachment holes and handle drilling. Check whether a tall front or an unusual hinge needs different mounting positions, and ask for confirmation from the hardware supplier. For a handleless layout, show the rail or pull profile and the clearance needed to grip it when adjacent doors are closed.
Check a representative pair of fronts before production
Mount a door and its neighboring front on the proposed cabinet. Check the gaps with both fronts closed, then open each through its intended range. Compare the edge treatment and surface appearance in the room lighting. If a door sits beside a wall or tall appliance, check that its corner and pull clear the obstruction. Record the agreed gap, hardware references and sample ID on the approval drawing.
At receiving, compare the packed part labels with the drawing before installation. Keep matched fronts together and confirm their sequence before removing protective packing. For a replacement, provide the finished dimensions, drilling view and a photograph of the adjoining fronts. Ask whether the current sample still matches the retained reference before releasing the replacement.
| Part | Dimensions to record |
|---|---|
| Door | Finished width, height and thickness, hinge cup position, opening direction and overlay. |
| Drawer front | Finished width, height and thickness, fixing positions and the gap to adjoining fronts. |
| Exposed edge | Edge profile, face and edge finish references, and visible grain direction. |
Measure the finished front and note how the door overlays the opening. Record the hinge cup diameter and hole positions from a named edge. For drawer fronts, identify how the front attaches to the drawer box and check the gap above and below it. Use the finish matching guide when the new fronts will sit beside existing panels.
Compare Shaker cabinet assemblies and flat-panel cabinet assemblies to see the clearances and edge details to verify with your selected door.
Request a packing schedule for this series
Ask for a line per cabinet reference and packing configuration. For example, if a cabinet box and its door kit travel separately, request the carton count, outside dimensions and gross weight for each package. Confirm how the cartons are labeled so receiving staff can match them to the same cabinet.
To compare 40 ft high-cube loading plans, give your freight planner the actual package mix, dimensions, gross weights and stacking limits. Use the loading estimator for identical cartons and verify the mixed-load plan before booking.
Prepare a series-specific quote request
- Identify the series and specify the cabinet construction and door profile.
- Send dimensioned elevations and a cabinet schedule with quantities, finished sizes and clear openings.
- Mark exposed faces and ends, the finish reference and any sample you need to approve.
- List required hinges, runners and accessories with their mounting clearances.
- Specify assembled or flat-pack delivery, destination and target arrival date.
Use the drawing checklist to reconcile the elevation and schedule, then submit your cabinet quote request.
Compare the Cabinet doors and drawer fronts category, review the quote checklist and confirm packing and handling requirements for this series.
Frequently asked questions
- What dimensions should I include for this series?
- List the finished width, depth and height for each cabinet. Give the clear opening separately when a fitting or appliance must pass through it.
- Can I change the construction or door profile?
- Show the requested change on the elevation and identify any affected clearances. Ask the supplier to confirm the available combination on the quote.
- How do I approve the finish?
- Request a physical sample with the specified face and edge treatment and identify adjoining parts that must match.
- What should I check before selecting hardware?
- Confirm door swing, runner length, mounting clearances and access to adjacent cabinets on the shop drawings.
- How can I compare packing options?
- Ask for carton quantities, packed dimensions and gross weights for the proposed assembled or flat-pack order.
What to specify
Our quotation uses finished sizes, substrate, exposed edges, grain direction and hardware locations. Sample approval covers both the face and edge finish.
Layout examples