Cabinari trade supply
Replacement cabinet fronts
Match replacement doors and drawer fronts to an existing cabinet run.
Check compatibility with the existing cabinet
Survey the existing doors and drawer fronts
Number each cabinet on a plan and give each front its own reference. Measure the finished width, height and thickness of the original front. Use the same reference edge for each drilling dimension and mark which face the measurements were taken from. Photograph the front and back with the cabinet reference visible. For paired doors, record the opening direction and measure both pieces separately, since the hole positions may be mirrored.
Check the condition of the cabinet box and the hardware before ordering a new front. A worn hinge or loose runner can change how a door or drawer sits. Decide whether existing hardware will be reused and record the part reference when available. If a hinge is being replaced, ask the supplier to confirm the new hole layout and whether it fits the cabinet-side mounting plate.
Trial fit one front before releasing the rest
Choose a front that has the most restrictive clearances, such as a door next to a wall or an appliance. Fit the proposed hinge and open the door through its intended range. Check the gap to the neighboring front when closed and check whether the handle touches anything as it opens. For a drawer, verify the attachment to the drawer box and confirm that the front can be adjusted to align with the surrounding pieces.
Keep the signed trial-fit record with the drilling drawing and approved finish sample. At receiving, sort the boxes by cabinet and front reference before removing old doors. For parts that are supplied undrilled, give the installer the approved drilling drawing and identify the correct reference edge on each piece. If a carton contains an incorrect hand or finish, keep its label and check the order record before making changes on site.
Organize the order by room and installation phase
List the fronts by room, cabinet and opening, then note which rooms will remain in use while work proceeds. Ask the supplier to label each package with the same references. Keep the original fronts available for comparison until the first replacements have been fitted. If a room uses a different finish or drilling pattern, identify it on both the schedule and the packing list so it can be separated at receiving.
For a partial replacement, compare the new sample against the cabinets that will stay in place. Record the finish and edge differences that the buyer approves. Give the installer the marked elevation showing where the new pieces belong. If another phase is ordered later, send the retained sample and the installed part reference with the revised schedule.
| Part | Dimensions to record |
|---|---|
| Door | Finished width, height and thickness, hinge cup position, opening direction and overlay. |
| Drawer front | Finished width, height and thickness, fixing positions and the gap to adjoining fronts. |
| Exposed edge | Edge profile, face and edge finish references, and visible grain direction. |
Measure the finished front and note how the door overlays the opening. Record the hinge cup diameter and hole positions from a named edge. For drawer fronts, identify how the front attaches to the drawer box and check the gap above and below it. Use the finish matching guide when the new fronts will sit beside existing panels.
Compare Shaker cabinet assemblies and flat-panel cabinet assemblies to see the clearances and edge details to verify with your selected door.
Request a packing schedule for this series
Ask for a line per cabinet reference and packing configuration. For example, if a cabinet box and its door kit travel separately, request the carton count, outside dimensions and gross weight for each package. Confirm how the cartons are labeled so receiving staff can match them to the same cabinet.
To compare 40 ft high-cube loading plans, give your freight planner the actual package mix, dimensions, gross weights and stacking limits. Use the loading estimator for identical cartons and verify the mixed-load plan before booking.
Prepare a series-specific quote request
- Identify the series and specify the cabinet construction and door profile.
- Send dimensioned elevations and a cabinet schedule with quantities, finished sizes and clear openings.
- Mark exposed faces and ends, the finish reference and any sample you need to approve.
- List required hinges, runners and accessories with their mounting clearances.
- Specify assembled or flat-pack delivery, destination and target arrival date.
Use the drawing checklist to reconcile the elevation and schedule, then submit your cabinet quote request.
Compare the Cabinet doors and drawer fronts category, review the quote checklist and confirm packing and handling requirements for this series.
Frequently asked questions
- What dimensions should I include for this series?
- List the finished width, depth and height for each cabinet. Give the clear opening separately when a fitting or appliance must pass through it.
- Can I change the construction or door profile?
- Show the requested change on the elevation and identify any affected clearances. Ask the supplier to confirm the available combination on the quote.
- How do I approve the finish?
- Request a physical sample with the specified face and edge treatment and identify adjoining parts that must match.
- What should I check before selecting hardware?
- Confirm door swing, runner length, mounting clearances and access to adjacent cabinets on the shop drawings.
- How can I compare packing options?
- Ask for carton quantities, packed dimensions and gross weights for the proposed assembled or flat-pack order.
What to specify
Measure an existing front and record its thickness, overlay and hinge drilling. Photograph the back and edge profile, and provide a physical finish reference where possible. Identify any differences between cabinet openings before finalising quantities.