Prepare a cabinet schedule in millimetres and review import documents for an Australian project.
Plan cabinet orders for Asia-Pacific destinations
Work back from the required arrival date
Send drawings in millimetres, the receiving location and the date the cabinets must be available on site. If the crew can receive only during specific windows, list those windows separately from the installation date.
| Milestone | What to confirm | Who provides the timing |
|---|---|---|
| Final delivery | Receiving address, unloading appointment and access for the delivery vehicle. | Receiving team and local carrier |
| Import clearance | Entry documents, inspection arrangements and release plan for the shipment. | Importer and customs broker |
| International transport | Routing, booking cutoff, departure and estimated arrival. Reconfirm capacity during peak periods. | Freight forwarder or carrier |
| Order release | Approved drawings and samples, cabinet quantities, packing list and cargo readiness. | Buyer and supplier |
Record the route and date of each estimate. Recheck the dates when equipment, shipment size or the receiving location changes. For phased projects, keep a separate milestone list for each release.
- Cabinet ordering
- Cabinet packaging
- Import document checklist by market
- Cabinet import documentation
- Kitchen cabinet catalog
Frequently asked questions
- What measurement unit should I use?
- Prepare the cabinet schedule in millimetres and identify the controlling unit on the drawings.
- Which destination details should I send?
- Give the receiving address or destination city and port, the required arrival date and any unloading restrictions.
- How should I count the order?
- State whether quantities are cabinet units or kitchen sets. For sets, include the cabinet breakdown for each layout and identify separately packed items.
- Can delivery be planned in phases?
- List the quantity and requested arrival window for each phase. Agree carton labels and receiving locations with the delivery team before shipment.
- Who reviews the import documents?
- Give the product description and material schedule to the importer or customs broker for a review of the specific shipment.
- How can I confirm arrival timing?
- Ask the carrier or freight forwarder to confirm the route and booking dates. Confirm clearance and delivery windows with the importer and receiving team.
Related guides
Prepare for Australian import review
Give the importer the cabinet description, material schedule, origin and packing details. Identify separately packed worktops, long panels and fixtures so each item can be reviewed in the form in which it will arrive.
| Official guidance | What to verify | Who reviews it | Information to prepare |
|---|---|---|---|
| DAFF timber and wooden articles | Which biosecurity conditions in BICON apply to the products and packaging. | Importer with supplier and freight information. | Material, product form, origin, packaging details and any evidence the applicable conditions require. |
| Australian Border Force import declarations | The entry process and product classification for the actual shipment. | Importer or licensed customs broker. | Shipment descriptions, quantities, invoice and customs value information. |
Prepare a quote in millimetres
Mark the finished room dimensions, appliance model openings and service locations on the drawings. List cabinet widths separately from fillers, end panels and worktops. Confirm which products are included in the quote and which will be supplied locally. If an appliance or sink is undecided, flag the opening it affects before releasing the cabinet schedule.
For a distributor, list quantities by cabinet reference and finish. For a project order, group the schedule by floor plan and show the breakdown of each kitchen set. If a layout is mirrored, record the handing and note which parts change. Identify separately packed hardware and panels so the receiving team can match them to the drawing.
Match the packing plan to the delivery site
Give the freight team the receiving postcode and the intended unloading location. Confirm access, delivery windows and how cartons will be sorted if the goods move from a warehouse to multiple sites. Ask the importer to check the packing materials against the applicable biosecurity conditions before dispatch. Keep the cabinet schedule, carton list and reviewed import records on the same revision.
Prepare a component and packaging register
Give each cabinet a reference that can be traced from the plan to the material schedule and packing list. List cabinet boxes, fronts and exposed panels separately when their materials differ. Describe the actual product form and identify pallets, crates and other packing materials on their own lines. Ask the importer which details it needs for its review and where those details should appear. When a material or packaging choice is undecided, record the outstanding decision and assign it to a reviewer before the order is released.
Compare the reviewed descriptions with the final carton schedule before dispatch. If a substitute panel or packaging material has been proposed, identify which cabinets or cartons are affected. Give the importer the revised description and ask whether it changes the information needed for clearance. Keep the current review with the shipment documents and identify who can answer questions about the materials if the freight team needs clarification.
Separate warehouse delivery from site installation
For deliveries that pass through a warehouse, give the freight team the first receiving address and give the installation team the address and timing for each onward delivery. Agree how cartons will be sorted and labelled before packing. A label can identify the job, room and cabinet reference even when a shipment serves several sites. Confirm who will reconcile the carton counts at each handoff and who will report any missing or visibly damaged package.
Check the route into the room for tall assemblies and long panels before confirming how they will be packed. Show doorways, corners, stairs and any delivery restrictions that affect handling. If installation is phased, list the cabinet quantities and required receiving dates for each release. Keep hardware and accessories linked to the cabinets they serve, including those that travel separately. At receipt, compare the labels with the latest approved schedule and assign any replacement to its original cabinet and site.