Use this topic to prepare a trade cabinet order from the first quote through the production release. Start with the cabinet mix and quantity unit, then work back from the required arrival date to plan drawing approval, sampling and freight. Keep your scope, quantities and revisions together so supplier quotes can be compared on the same basis. The quote checklist identifies what to send and what to flag for confirmation when finishes, fixtures or phased deliveries still need a decision.

Read in this order

  1. Kitchen cabinet minimum order
  2. Planning cabinet lead times
  3. Cabinet quote checklist

Key concepts

Minimum order
The starting quantity for a trade order.
Quantity unit
Identify whether the count refers to cabinets or kitchen sets.
Drawing revision
The version used to quote or release the order.
Sample approval
The recorded decision on the physical reference.
Required arrival
The date the receiving team needs the goods.

Apply this topic to your project

Build a cabinet schedule before requesting a quote. Give each cabinet an identifier that also appears on the drawing. List its size, quantity, finish and handing where these are known. If the project counts complete kitchens, show the cabinets in each set and the number of sets required. Keep spare units, fillers and finished panels on separate lines so their quantities remain visible. Identify each drawing revision and flag any dimensions that still need site confirmation.

Define the scope before comparing quotations. Specify which cabinet parts, hardware and accessories are included. List worktops, sinks and faucets separately if you want them quoted. For an item that remains undecided, say whether the supplier should include an allowance or price it as an option. Compare quotations against the same drawings, quantity units and delivery assumptions. Ask the supplier to explain any differences in the material, finish, packaging or approval requirements before selecting an offer.

Work backward from the required arrival date. Give the supplier the destination and any receiving windows, then ask which drawings, samples and commercial documents must be approved before the order can be released. Ask the freight team to confirm the routing and booking assumptions for the proposed shipment. Record those assumptions with the schedule. If the delivery is phased, list quantities, dates and carton labels for each phase, so the receiving crew can identify the packages assigned to its release.

Use one record to document the final approvals. Match the approved quote to the latest cabinet schedule, drawings and sample references. Record the finish and hardware selected for each variation, and identify any decisions that still require an owner and due date. When a drawing or finish changes, review the effect on the cabinet mix, carton schedule and requested dispatch date. Send the updated set to the supplier and installation team so the order proceeds from the same documents.

At release, confirm what the supplier will use to prepare the packing list and what the receiving team expects to see on the labels. Keep the agreed schedule with the purchase documents. When a shipment is ready, compare its carton list with the cabinet quantities and note any separately packed parts. That comparison helps the receiving team trace questions to a particular cabinet or delivery phase.