Cabinets for ADU projects

Prepare a cabinet schedule for a compact accessory dwelling unit.

What to specify

Send the finished wall dimensions and appliance model drawings together. Mark service access, door swings and any cabinet parts that must pass through a narrow entrance. Identify storage priorities and show which panels must be finished on the elevations.

Compare quotes by set or by cabinet

Quote basisWhat to sendWhat to verify
Per setOne cabinet schedule per ADU layout and the number of matching sets.Check which fronts, panels, fillers and hardware belong to one set.
Per cabinetOne line per cabinet identifier with dimensions, finish and quantity.Count accessories, spare parts and separate packages independently.

Measure the room and the route into it

Start with the finished floor plan and record the dimensions at the height of the base cabinets, the worktop and the top of any tall storage. A compact room may have a bulkhead or service chase that only affects part of the run. Mark each obstruction on the elevation and record how far it projects from the finished wall. If the room is still being built, distinguish the projected finished dimension from a verified site measurement. Identify who will check each provisional dimension before production.

Measure the route from the unloading area to the room. Record doorway openings, tight turns, stairs and changes in ceiling height. Compare these with the dimensions of the largest packed and assembled components. If a tall cabinet can enter the room only in sections, discuss the packing and assembly plan with the supplier and installer before release. Flag long worktops and finished panels separately so their handling requirements are visible on the order.

Check that storage and appliances can operate together

Place the selected appliances on the plan and include their model drawings. Mark required openings, service access and the direction in which each door opens. On a narrow aisle, check the path of a drawer or appliance door against the cabinet run opposite it. Where a sink sits over storage, show the basin depth and waste location on the elevation. A cabinet can fit the available width while its hardware or contents still interfere with an adjacent fitting.

Prioritize the storage the occupants will use most often and identify where a shelf, drawer or pull-out needs a specific clear opening. Separate fixed panels from operable fronts on the schedule. Show any cabinet that must be removed to reach a shutoff or other service point and review the proposed arrangement with the installer. Where the layout combines kitchen and laundry functions, identify the services and access requirements for both equipment groups.

Approve the order and installation sequence

Send a dimensioned plan, elevations and a schedule that uses the same cabinet identifiers. State whether the quote covers one complete layout or individual cabinets. List fillers, trim and visible end panels separately where they are supplied apart. Give the installer the drawings and proposed delivery sequence before approval, so the team can identify any piece that should enter before another trade closes access or installs a fixture.

Use the approved drawings and finish reference to review a sample or first assembly. Record any revision against the relevant cabinet identifier and recheck the route into the room if the size changes. At delivery, compare the packing list with the order and group packages in installation order. Keep separately packed hardware with the cabinet it serves and note any damaged or missing items before work begins.

Plan the handoff

Review delivery access and installation order alongside the cabinet schedule. Give the supplier the drawing revision, quantity schedule and required arrival date for each release.

Review an approved sample against the current drawings before releasing repeat units. At delivery, compare each carton label with the packing list and record any missing or damaged packages.

Prepare a detailed quote request

Frequently asked questions

How should I count the cabinets?
State the number of sets and list the cabinets in each set. Keep spares and separately quoted parts on their own lines.
What should I show on the drawings?
Provide a dimensioned plan, elevations and cabinet identifiers. Identify appliance openings and cabinet parts that must pass through a narrow entrance.
Can I specify a sample before the full order?
Identify the assembly and finish to review and provide the drawing revision. Agree the approval criteria before the bulk release.
How should I plan delivery?
Review delivery access and installation order alongside the cabinet schedule.
What should the receiving team check?
Match carton IDs and quantities to the packing list. Record missing or damaged packages against their identifiers before sorting the order.