Cabinari trade supply
Wholesale Shaker RTA Kitchen Cabinets
Shaker cabinets packed for assembly.
Pair each Shaker front with its box and hardware kit
Assign a single cabinet reference to the box panels, door or drawer fronts and hardware needed for the assembled unit. List the finished dimensions and opening direction of each front separately. A left and right pair can have the same outside dimensions and different hinge drilling. Identify the hand on the front drawing and carton label. When one carton contains fronts for several boxes, request a contents list that shows which cabinet each front belongs to.
Give the supplier the approved drawing revision for the box, door and drilling. Check that the hinge model and mounting plate shown on the drawing are included in the hardware list. If the order uses different hinges for a corner cabinet or drawers with different runners, assign separate kit references. Ask the supplier to identify where the parts are packed and to show those references in the assembly instructions.
Check the profile on an assembled sample
Request a sample cabinet with the approved Shaker door and at least one adjoining front. Check the rail and stile proportions, the finish in the recessed corners and the gaps between fronts. Open the doors through the required range and check handle clearance. If the drawer fronts use a different profile, approve the appearance of the doors and drawers together. Record the sample reference on the cabinet and finish schedules.
Trial assemble the sample from the proposed packaging using the supplied instructions. Check whether left and right panels can be identified, whether the hardware bags match the parts list and whether the assembly sequence leaves access to the required fasteners. Document any mismatch against the cabinet reference and ask for revised drawings or labels before the next batch is released. Keep the approved instruction revision with the sample record.
Stage cartons and verify the first room
Before installation, reconcile one room against the packing list. Keep the box panels, fronts and fittings together until the cabinet has been assembled and the finish checked. Protect the finished faces while parts are staged. If a front is damaged, retain its carton label and photograph the affected profile and edge. Send the finished dimensions, drilling view and sample ID when requesting a replacement.
For phased work, identify the order release and drawing revision on the room schedule. Compare the first unit from each release with the approved sample. Confirm any change to hardware or packaging before distributing cartons to the installation teams. Keep spare fittings and matching fronts grouped by finish and release so later repairs can be traced to the right parts.
Before signing off the room, check that the spare fronts and fittings are labeled for the same cabinet revision. Give the maintenance team the final room schedule and the location of the retained finish sample.
Request a packing schedule for this series
Ask for a line per cabinet reference and packing configuration. For example, if a cabinet box and its door kit travel separately, request the carton count, outside dimensions and gross weight for each package. Confirm how the cartons are labeled so receiving staff can match them to the same cabinet.
To compare 40 ft high-cube loading plans, give your freight planner the actual package mix, dimensions, gross weights and stacking limits. Use the loading estimator for identical cartons and verify the mixed-load plan before booking.
Prepare a series-specific quote request
- Identify the series and specify the cabinet construction and door profile.
- Send dimensioned elevations and a cabinet schedule with quantities, finished sizes and clear openings.
- Mark exposed faces and ends, the finish reference and any sample you need to approve.
- List required hinges, runners and accessories with their mounting clearances.
- Specify assembled or flat-pack delivery, destination and target arrival date.
Use the drawing checklist to reconcile the elevation and schedule, then submit your cabinet quote request.
Compare the RTA cabinets category, review the quote checklist and confirm packing and handling requirements for this series.
Frequently asked questions
- What dimensions should I include for this series?
- List the finished width, depth and height for each cabinet. Give the clear opening separately when a fitting or appliance must pass through it.
- Can I change the construction or door profile?
- Show the requested change on the elevation and identify any affected clearances. Ask the supplier to confirm the available combination on the quote.
- How do I approve the finish?
- Request a physical sample with the specified face and edge treatment and identify adjoining parts that must match.
- What should I check before selecting hardware?
- Confirm door swing, runner length, mounting clearances and access to adjacent cabinets on the shop drawings.
- How can I compare packing options?
- Ask for carton quantities, packed dimensions and gross weights for the proposed assembled or flat-pack order.
What to specify
Our order specification combines the Shaker profile and finish with cabinet sizes and component lists. An assembled sample establishes front alignment and the assembly reference.