Cabinari trade supply
Face-frame cabinet boxes
Face-frame cabinet boxes for trade orders.
Define the boundary between the box and the front
Mark which parts the box supplier will provide, including backs, shelves, stretchers, finished ends and hardware mounting provisions. If fronts come from another supplier, give both suppliers the same opening and drilling drawings. Agree who checks the assembled fit before either order goes into production.
Dimension the clear opening between the frame members separately from the outside box. Show the center stile if used and locate any mounting blocks behind the frame. Compare the usable opening with the actual drawer, runner and pull-out specifications.
Use the same reference edges across suppliers
Give the front and box suppliers a dimensioned section showing the outside width, the opening, the front position and the side or frame thickness. Name the reference edge for each drilling dimension and identify whether the drawing is viewed from the front or the back. Include the expected gaps with adjacent cabinets. Agree which dimensions should be checked on the assembled sample before either supplier releases the remaining parts.
For example, when a pull-out and its cabinet box come from different suppliers, list the accessory model and its mounting requirements beside the cabinet ID. Verify that the accessory clears the opening and hinge when extended. If a mounting block is required, show its position and thickness and ask who will provide and fit it. Keep the approval with both purchase orders so subsequent revisions reach both suppliers.
Approve an assembled box with the intended hardware
Check the diagonals, opening dimensions and shelf fit on a representative box. Install a hinge or runner at the proposed drilling position and verify that it clears the neighboring parts. Record the box reference, drawing revision and any changes before approval. Ask the receiving team to compare the first box from each delivery with that record before sorting the rest.
Reconcile the box and front deliveries
Prepare one schedule with a line for each assembled cabinet and separate columns for the box, front and hardware order references. At receiving, compare the carton labels with that schedule before moving parts to individual rooms. If a box arrives before its fronts, record where it is stored and keep its fixing hardware with it. Check the first complete group together before releasing the rest to installers.
For a replacement, give the supplier the installed opening, the original box reference and the drawing revision. Photograph the mounting locations and record any alterations the installer made on site. Ask the supplier to confirm whether the replacement uses the same fittings. Update the record for the room after installation so future parts can be checked against the cabinet actually in place.
Where the same layout repeats, compare the room records before transferring spare parts between installations. A replacement should match the opening and drilling shown for the receiving cabinet.
Request a packing schedule for this series
Ask for a line per cabinet reference and packing configuration. For example, if a cabinet box and its door kit travel separately, request the carton count, outside dimensions and gross weight for each package. Confirm how the cartons are labeled so receiving staff can match them to the same cabinet.
To compare 40 ft high-cube loading plans, give your freight planner the actual package mix, dimensions, gross weights and stacking limits. Use the loading estimator for identical cartons and verify the mixed-load plan before booking.
Prepare a series-specific quote request
- Identify the series and specify the cabinet construction and door profile.
- Send dimensioned elevations and a cabinet schedule with quantities, finished sizes and clear openings.
- Mark exposed faces and ends, the finish reference and any sample you need to approve.
- List required hinges, runners and accessories with their mounting clearances.
- Specify assembled or flat-pack delivery, destination and target arrival date.
Use the drawing checklist to reconcile the elevation and schedule, then submit your cabinet quote request.
Compare the Cabinet boxes category, review the quote checklist and confirm packing and handling requirements for this series.
Frequently asked questions
- What dimensions should I include for this series?
- List the finished width, depth and height for each cabinet. Give the clear opening separately when a fitting or appliance must pass through it.
- Can I change the construction or door profile?
- Show the requested change on the elevation and identify any affected clearances. Ask the supplier to confirm the available combination on the quote.
- How do I approve the finish?
- Request a physical sample with the specified face and edge treatment and identify adjoining parts that must match.
- What should I check before selecting hardware?
- Confirm door swing, runner length, mounting clearances and access to adjacent cabinets on the shop drawings.
- How can I compare packing options?
- Ask for carton quantities, packed dimensions and gross weights for the proposed assembled or flat-pack order.
What to specify
Our order specification covers outside dimensions, frame openings, exposed sides, finished edges, hinges and drawer slides. The box and front dimensions are coordinated together.