Back to overview

Cabinari trade supply

Double-sink bathroom vanities

Plan a double-sink vanity around basin locations and storage.

Set both basin centerlines before approving the cabinet

Draw the worktop, cabinet partitions and basin outlines on the same plan. Dimension both basin centers from a finished wall or a named cabinet edge. Check the available space between the basins for the tap positions and any accessories. If the layout is offset to suit a window or wall return, show the actual offset on the drawing and identify which end of the cabinet will be visible.

Send the basin and tap model references with the inquiry. Ask the worktop supplier to show the cutouts, edge profile and any support required between the two openings. Confirm whether the cabinet supplier, worktop supplier or installer is responsible for measuring and making each cutout. Use the same drawing revision for both trades and record the dimensions that must be checked after the cabinet is positioned.

Keep plumbing accessible without losing the planned storage

Put both traps, waste outlets and shutoff valves on the cabinet elevation. Draw the drawer boxes, runners and shelves in the same view. Where a pipe crosses the path of a drawer, agree whether the drawer will be shortened, shaped around the service or replaced by a door and shelf. Keep the agreed service space visible on the drawing so the installer knows which areas must remain accessible.

Compare the cabinet plan with the plumbing locations measured on site. If a supply pipe is farther from the wall than expected, confirm whether the installer can adjust the route or whether the cabinet needs a different back or access panel. Mark any site-cut opening and obtain the cabinet supplier's approval before changing a part that also supports the worktop or hardware.

Check access around the vanity

Show the vanity beside the bathroom door, shower screen and any nearby wall return. Open the doors and drawers on the drawing and check where the handles project. For a narrow room, record the space available for someone to use the basin while a drawer is open. Where the finished floor or skirting changes at the vanity, ask the installer to confirm how the end panels and plinth will meet those surfaces.

Approve a sample and inspect the first delivery

Review a representative front, end panel and handle together under the proposed bathroom lighting. Check that the selected finish looks consistent across the left and right cabinet sections. At receiving, reconcile the cabinet, worktop, fittings and any separately boxed trim with the approved list. Record each carton label before moving the parts to the room. If a basin opening or fitting position differs from the drawing, hold the affected parts for review before cutting or installing them.

For repeated rooms, list each layout and its quantities separately, including mirrored configurations. Give the receiving team a copy of the room schedule and identify the cartons that must remain together. Keep the approved sample and drawing reference for later replacements.

Compare vanity options for the same room

Compare each option against the same basin, plumbing and finished room dimensions. A mounting style, a door profile and a material choice can describe the same vanity. Include all three on the cabinet schedule when requesting a quote.

Request a packing schedule for this series

Ask for a line per cabinet reference and packing configuration. For example, if a cabinet box and its door kit travel separately, request the carton count, outside dimensions and gross weight for each package. Confirm how the cartons are labeled so receiving staff can match them to the same cabinet.

To compare 40 ft high-cube loading plans, give your freight planner the actual package mix, dimensions, gross weights and stacking limits. Use the loading estimator for identical cartons and verify the mixed-load plan before booking.

Prepare a series-specific quote request

  1. Identify the series and specify the cabinet construction and door profile.
  2. Send dimensioned elevations and a cabinet schedule with quantities, finished sizes and clear openings.
  3. Mark exposed faces and ends, the finish reference and any sample you need to approve.
  4. List required hinges, runners and accessories with their mounting clearances.
  5. Specify assembled or flat-pack delivery, destination and target arrival date.

Use the drawing checklist to reconcile the elevation and schedule, then submit your cabinet quote request.

Compare the Bathroom vanities category, review the quote checklist and confirm packing and handling requirements for this series.

Frequently asked questions

What dimensions should I include for this series?
List the finished width, depth and height for each cabinet. Give the clear opening separately when a fitting or appliance must pass through it.
Can I change the construction or door profile?
Show the requested change on the elevation and identify any affected clearances. Ask the supplier to confirm the available combination on the quote.
How do I approve the finish?
Request a physical sample with the specified face and edge treatment and identify adjoining parts that must match.
What should I check before selecting hardware?
Confirm door swing, runner length, mounting clearances and access to adjacent cabinets on the shop drawings.
How can I compare packing options?
Ask for carton quantities, packed dimensions and gross weights for the proposed assembled or flat-pack order.

What to specify

Provide both basin specifications and their centre lines. Show waste and supply positions, the worktop drawing and the proposed drawer layout. Identify any usable storage between the basins.

Related topics

Request a cabinet quote

WhatsApp
EnquireWhatsAppEmail