Cabinet sourcing for North America

Plan cabinet orders with inch-based schedules and separate delivery and document requirements for each destination.

What to specify

Start with the country where the goods will enter and the address where they will be received. Mark both when the order is cleared in one location and delivered to another. Keep cabinet widths, appliance openings and finished filler sizes in the same unit on the drawings.

Work back from the required arrival date

Send drawings in inches, the receiving location and the date the cabinets must be available on site. If the crew can receive only during specific windows, list those windows separately from the installation date.

MilestoneWhat to confirmWho provides the timing
Final deliveryReceiving address, unloading appointment and access for the delivery vehicle.Receiving team and local carrier
Import clearanceEntry documents, inspection arrangements and release plan for the shipment.Importer and customs broker
International transportRouting, booking cutoff, departure and estimated arrival. Reconfirm capacity during peak periods.Freight forwarder or carrier
Order releaseApproved drawings and samples, cabinet quantities, packing list and cargo readiness.Buyer and supplier

Record the route and date of each estimate. Recheck the dates when equipment, shipment size or the receiving location changes. For phased projects, keep a separate milestone list for each release.

Frequently asked questions

Can US and Canadian projects share an inch-based schedule?
Yes, when both project teams approve inches as the controlling unit. Keep the destination and importer on each order line.
How do I compare a millimetre drawing with an inch schedule?
Convert the dimensions and compare appliance openings, panel thicknesses and finished widths against the original schedule before approval.
How should I count the order?
State whether quantities are cabinet units or kitchen sets. For sets, include the cabinet breakdown for each layout and identify separately packed items.
Can delivery be planned in phases?
List the quantity and requested arrival window for each phase. Agree carton labels and receiving locations with the delivery team before shipment.
Who reviews the import documents?
Give the product description and material schedule to the importer or customs broker for a review of the specific shipment.
How can I confirm arrival timing?
Ask the carrier or freight forwarder to confirm the route and booking dates. Confirm clearance and delivery windows with the importer and receiving team.

Related guides

Choose your destination

For a multi-country order, label the project and destination on every cabinet schedule. Ask the importer to review the panel and packaging descriptions for each shipment. Give the receiving teams separate carton lists and a contact for shortages.

Reconcile dimensions before comparing quotes

Record the controlling unit on the drawing and keep appliance clearances separate from nominal cabinet widths. Where a supplier returns millimetre dimensions, compare the converted values against the original schedule before approving the order.

Separate deliveries by destination

Use separate packing lists and receiving contacts for US and Canadian shipments. Give each importer the material descriptions and shipment details for its own order.

Prepare records by destination

DestinationRecords to reviewWho confirms
United StatesPanel schedule and supplier recordsImporter and broker
CanadaComponent descriptions and applicable supplier statementsImporter and broker

Approve the first room before releasing repeat layouts

Choose a representative room and share its site measurements with the supplier, installer and worktop team. Ask each party to mark the dimensions it relies on. Include the distance between finished walls, service positions and the clearance needed to remove drawers or reach shutoff valves. If the room differs from the approved elevation, issue a revised drawing and identify which other rooms need the same change.

Use the first room to check how the carton identifiers match the installation sequence. Keep fasteners and fittings with the cabinet they serve and mark any components that need to be fitted by another trade. Have the receiver record shortages against the part list before installation. For later releases, send the supplier a single schedule showing approved changes and quantities by room.

Where the same cabinet is ordered with different finishes, record the sample reference on each line. Compare the first installed unit with the retained sample and confirm which adjacent panels should match before releasing later batches.

Compare quotes for separate delivery phases

Give each phase its own release number and receiving window. Attach the cabinet schedule and mark which layouts repeat, which units are mirrored and which parts are shared across rooms. Ask the supplier to quote the phases separately so the project team can see where a change in quantities affects packing, hardware or replacement stock. Record the quote and drawing revision together before issuing the purchase order.

For each receiving location, identify who can accept the shipment, where the vehicle can unload and how cartons will reach the installation area. If there is a warehouse between the port and the site, confirm who will split the load and give that team a packing list organised by destination. Include a reference for loose fillers, spare fronts and hardware so they stay with the intended cabinets.

Before approving the first shipment, review the finished sample against the elevation. Photograph the approved front and end panel together and record the finish reference. At receipt, check carton counts against the delivery list and record damage by part number and room. Use the same references when requesting replacements so the supplier can match the approved finish and drilling pattern.