Cabinet sourcing for Israel

Coordinate millimetre drawings and receiving instructions for an Israeli cabinet project.

What to specify

Mark appliance clearances, hinge hand and finished ends on each elevation. Confirm label language and room identifiers with the receiving team, especially for mirrored layouts.

Work back from the required arrival date

Send drawings in millimetres, the receiving location and the date the cabinets must be available on site. If the crew can receive only during specific windows, list those windows separately from the installation date.

MilestoneWhat to confirmWho provides the timing
Final deliveryReceiving address, unloading appointment and access for the delivery vehicle.Receiving team and local carrier
Import clearanceEntry documents, inspection arrangements and release plan for the shipment.Importer and customs broker
International transportRouting, booking cutoff, departure and estimated arrival. Reconfirm capacity during peak periods.Freight forwarder or carrier
Order releaseApproved drawings and samples, cabinet quantities, packing list and cargo readiness.Buyer and supplier

Record the route and date of each estimate. Recheck the dates when equipment, shipment size or the receiving location changes. For phased projects, keep a separate milestone list for each release.

Related guides

Confirm the tariff classification before booking

Official referenceWhat to checkWho checksRecords to prepare
Israel Tax Authority customs tariffIdentify the tariff heading for the goods as shipped.Importer and customs brokerProduct descriptions, materials and assembly condition.
Ministry of Economy importer guideCheck the Free Import Order for the heading and determine which approvals or licences apply.ImporterBroker’s document list and any approvals applicable to the shipment.

Give the broker separate descriptions for complete cabinets, loose fronts and accessories if they ship together. Ask the broker to confirm whether they should be listed separately. Check that the descriptions match the invoice and packing list before the documents go to the forwarder.

Confirm measurements before releasing the cabinet order

Measure the finished wall opening at floor, counter and upper cabinet height. Write down where each dimension was taken and note any wall that is out of square. On the elevation, dimension the cabinet boxes separately from fillers, finished panels and appliance openings. Mark where the installer expects to trim a filler on site and which edges must arrive finished. If floors or wall finishes are still being installed, arrange a final measurement before approving custom parts.

Put appliance model numbers and service positions on the same drawing revision as the cabinet schedule. Check the doors and drawers beside wall returns, especially where a handle projects into the opening. Ask the worktop supplier to confirm which measurements it needs after the boxes have been fixed. If the sink or hob comes from another supplier, agree who is responsible for the cutout and share the product drawing before approving the cabinet below it.

Check the room references before splitting a load

For a shipment serving several addresses, give the receiving team a cabinet schedule and packing list for each stop. Include the delivery contact, access hours and unloading location. Mark complete room sets and any separately packed hardware so the crew can keep related cartons together. For mirrored rooms, compare the carton references against the left and right elevations before sending units to the site.

At receipt, count the cartons before they are moved and note damage against the packing reference. Photograph both the damaged area and the carton label. If a finish or size differs from the approved sample or drawing, hold the affected part for review. Send the cabinet number, room reference and drawing revision with any replacement request so the supplier can check the specific part.

If an order includes fronts sold separately, give each front a part reference and identify which cabinet it fits. Include the profile and finish sample references and mark which edges are visible. For a replacement, record the original hinge drilling and handle positions as well as the finished dimensions. Compare the final drawing with the carton list before release, and give the receiving team a copy so it can identify loose fronts without opening the cartons for complete cabinets.

Plan delivery by room and drawing revision

For stock orders, identify cabinet models and spare fronts separately. For repeated apartment layouts, give each room a reference and separate mirrored kitchens on the packing list. For a renovation, use finished millimetre dimensions and confirm appliance and worktop drawings before approving production.

StageConfirm
Factory releaseSupplier confirms packing date, carton count and weight.
Port arrivalForwarder confirms discharge port, transfers and estimated arrival from the booking.
Site deliveryBroker confirms release and receiving team confirms access and unloading time.

Frequently asked questions

What units should my drawings use?
Use millimetres consistently and give finished cabinet sizes and clear openings separately.
Who confirms the tariff heading?
The importer should confirm it with the customs broker using the actual contents and assembly condition.
How should I identify mirrored kitchens?
Assign separate layout references and show door handing and visible finished ends on each elevation.
Can the cartons use our room references?
Share your room schedule and agree the label wording and language before the packing list is approved.
When can I schedule the installer?
Check the booked sailing, clearance and unloading appointment before assigning an installation date.
What should I send with an inquiry?
Send drawings, quantities, finish references and the final delivery address.

Review the drawing checklist, quote checklist and packing guide.