Cabinari trade supply
Cabinet sourcing for Germany
Prepare a cabinet schedule in millimetres and review import documentation for a German project.
Plan cabinet orders across Europe
Work back from the required arrival date
Send drawings in millimetres, the receiving location and the date the cabinets must be available on site. If the crew can receive only during specific windows, list those windows separately from the installation date.
| Milestone | What to confirm | Who provides the timing |
|---|---|---|
| Final delivery | Receiving address, unloading appointment and access for the delivery vehicle. | Receiving team and local carrier |
| Import clearance | Entry documents, inspection arrangements and release plan for the shipment. | Importer and customs broker |
| International transport | Routing, booking cutoff, departure and estimated arrival. Reconfirm capacity during peak periods. | Freight forwarder or carrier |
| Order release | Approved drawings and samples, cabinet quantities, packing list and cargo readiness. | Buyer and supplier |
Record the route and date of each estimate. Recheck the dates when equipment, shipment size or the receiving location changes. For phased projects, keep a separate milestone list for each release.
- Cabinet ordering
- Cabinet packaging
- Import document checklist by market
- Cabinet import documentation
- Kitchen cabinet catalog
Frequently asked questions
- What measurement unit should I use?
- Prepare the cabinet schedule in millimetres and identify the controlling unit on the drawings.
- Which destination details should I send?
- Give the receiving address or destination city and port, the required arrival date and any unloading restrictions.
- How should I count the order?
- State whether quantities are cabinet units or kitchen sets. For sets, include the cabinet breakdown for each layout and identify separately packed items.
- Can delivery be planned in phases?
- List the quantity and requested arrival window for each phase. Agree carton labels and receiving locations with the delivery team before shipment.
- Who reviews the import documents?
- Give the product description and material schedule to the importer or customs broker for a review of the specific shipment.
- How can I confirm arrival timing?
- Ask the carrier or freight forwarder to confirm the route and booking dates. Confirm clearance and delivery windows with the importer and receiving team.
Related guides
Prepare for EU import review
Give the importer the destination, product description, material schedule and packing scope. Ask which records are needed for the cabinet models and shipment being quoted. Record the review date and reopen any item affected by a material change.
| Official guidance | What to verify | Who reviews it | Information to prepare |
|---|---|---|---|
| European Commission import guidance | Classification, origin and applicable import measures. | Importer and customs broker. | Product descriptions, origin details, quantities and proposed packing list. |
| EU Deforestation Regulation | Whether the classification falls within the product scope, and which rules and dates apply to the operator. | EU operator or its authorized representative, as applicable. | Classification, material and supply-chain information requested for the review. |
| REACH formaldehyde restriction | Which finished articles are in scope and which test conditions or exceptions apply. | Importer and product compliance team. | Finished article description, panel schedule and any applicable test evidence requested by the buyer. |
Prepare dimensions in millimetres. Show finished openings, visible edges and appliance interfaces on the elevation. For a phased project, identify which cabinet lines and supporting records apply to each shipment.
Prepare the drawings and quantity schedule
Use a cabinet identifier on the floor plan, elevation and quantity schedule. Measure the room between finished surfaces and show the position of openings and services. Keep the measured room width separate from the space reserved for fillers and scribing. Where a tall cabinet meets a ceiling or bulkhead, record the available height and identify the dimension that still needs a site check. Include selected appliance model references so the supplier can verify opening sizes and service access.
For a project in Germany, send the receiving postcode and municipality, and identify whether the order will arrive at a distribution warehouse or go directly to the site. Ask the receiving team which German-language label or installation information it needs. If the project uses repeated kitchen layouts, record the cabinet and room identifiers separately so deliveries can be sorted without opening the cartons.
Define the cabinet package before comparing quotes
State whether quantities refer to individual cabinet units or complete kitchen sets. For a set, list the cabinets and hardware it includes. Identify finished end panels, fillers and spare fronts on separate lines when they will be supplied or packed separately. Attach the current drawings and label optional worktops or fixtures so the supplier can price them on the same basis as the main package. Keep any unapproved material or finish on a separate list and record who will approve the sample.
Connect each proposed panel or finish to the relevant cabinet line when compiling material records. If a different panel is proposed after the order is quoted, identify the cabinets affected and ask the buyer to review the finish and construction. Share the revision with the importer for its documentation review. Keep the approved schedule and samples together so the documents correspond to the actual goods, including parts packed apart from the cabinet boxes.
Confirm the handoff from freight to installation
Give the freight team the actual destination, carton schedule and required arrival window. Ask which parts of the route and clearance plan are confirmed and which are estimates. If there are several shipments, match each release to the rooms or floors that will be ready to receive it. Agree where the crew can unload and sort cartons, and ask the receiving team to check the proposed labels before packing. On arrival, record missing or visibly damaged cartons against their identifiers before sending the shipment to the installation area.