Back to overview

Cabinari trade supply

Lacquer and PU cabinet finishes

Specify lacquer or polyurethane finish, sheen and appearance for cabinet quotations.

Compare finishes on the actual cabinet part

Request samples on the proposed substrate with the intended edge treatment. Compare them under the lighting expected at installation and ask for the test method behind any performance claim.

Finish checks before sample approval
FinishSheenDurabilityRepairabilityWhere to review
Lacquer and PU cabinet finishesAgree the appearance on the physical sample.Request evidence for the expected cleaning and wear.Ask for the approved touch-up or replacement method.Check a representative face, corner and exposed edge.
UV-cured cabinet finishesCompare samples under the same lighting.Compare results only where the test methods and conditions match.Check whether a repair can match adjacent parts.Check the finish at edges and profiles, especially where faces and edges use different processes.

Review the finish before releasing production

  1. Confirm the substrate and identify the cabinet parts, faces and edges that will receive the finish.
  2. Record the color, sheen and any texture or grain reference.
  3. Request the coating system and sheen reference. Inspect buildup and appearance at profiles and edges.
  4. Compare the sample with adjoining materials and inspect it under the expected installation lighting.
  5. Record the approved sample reference, date and drawing revision on the order.

Record the approved sample and cabinet part IDs in the order. Use the finish matching guide when an order includes more than one cabinet finish or delivery batch.

Review the substrate and door profile

Compare the panel specifications before requesting a finish sample. Confirm with the supplier which combinations are available for the selected cabinet part.

Set color and sheen expectations for phased orders

Keep one approved sample with the supplier and one with the receiving team. Label both with the same finish reference and approval date. For visible groups such as an island or a row of tall cabinets, identify which fronts and end panels will be seen together. Ask the supplier to confirm how those parts will be grouped for production and marked on the packing list.

For a later phase, compare a new sample against the retained reference before approving the release. If the order requires a measured color difference or gloss tolerance, record the measurement method, viewing conditions and agreed limit in writing. At delivery, record the carton and part identifiers for any mismatch so a replacement can be checked against the correct finish.

Example: approve a door and a matching end panel

Suppose a run of cabinets has a finished end panel beside the last door. List both part numbers on the approval form and request a sample of each on the specified substrate. Set them at the same angle and view them from the direction of the main aisle. Compare the visible face, the corner where the two parts meet and any change in appearance across the edge. If the samples look different, record where the difference is visible and agree which sample should be revised.

At the first delivery, match the carton labels to the approval form before installation. Compare one door and its matching panel together, then keep those references with the receiving record. If a replacement is needed, send the part number and finish reference so the supplier can check both the appearance and the fit.

Agree on cleaning and repair before handover

Ask for the care instructions for the finish on your order. Record approved cleaning products, how spills should be handled and who can approve a repair. Keep a spare finished front for comparison when matching a replacement is important.

Frequently asked questions

How do I approve sheen?
Compare physical samples in the intended lighting and record the approved sample reference.
Which sample should I request?
Use the proposed substrate and finish on a representative face, exposed edge and corner.
How can I compare wear or moisture performance?
Ask for results for the exact finish system. Compare only when the test method and conditions match.
What if a front is damaged at delivery?
Record the cabinet and part reference and photograph the damage. Ask whether the approved method calls for repair or replacement.
How do I match a later delivery?
Send the original order and sample reference and compare the new sample with retained parts before approval.

What to specify

Identify the coated faces, edges and profiles. Provide a colour reference and approve a sample on the intended substrate. Confirm the coating system for the specific component before releasing production.

Related topics

Request a cabinet quote

WhatsApp
EnquireWhatsAppEmail